Inside AiCE

The whole rig, in one record.

Permits, safety cards, certificates, inspections, maintenance, stores, procurement and budget, on one machine on the rig. Pick an area, pick a role, or follow one shift.

Fleet Scorecard comparing rigs side by side on safety, compliance, work and downtime, with best and worst marked in each row
Best ▲ and worst ▼ marked in every row · 30-day change on every tileDemonstration fleet · fictional rigs
One system instead of
  • Spreadsheet registers
  • Paper permit books
  • A separate HSE card tool
  • A separate maintenance app
  • Stores ledgers
  • Month-end report packs
  • Email chains for spares

Inside AiCE

Every function, one window.

31 screens and 161 tabs for the rig; 17 screens and 95 tabs for the operator window (counted on build dd02218, 9 October 2026). Grouped here into eighteen areas. Pick one to see what it does.

Overview

Dashboard & Critical

The rig's position on one screen, and only the things that need a decision today.

Every count opens its records
  • Needs-attention stripRising stock draw, reorder exposure, unattributed issues, hazmat placement, CAP recurrence, card exceptions and escalation suggestions, each a count that opens what it counts.
  • Critical viewEverything due inside seven days or already overdue, from certificates, regulatory items, maintenance and inspections, in one list.
  • Reminder ladder: 90, 30, 14 days, then dailyFires once at each step, so nobody is flooded and nothing is missed.
  • Grouped notification bellAlerts grouped by kind, never a wall of 99+, and every row takes you to the record.
  • Rig selector on every screenSwitch rigs from one pill; every figure follows.
Needs attention · TAD-1Today
Rising draw3items
Below minimum5lines
Card exceptions4to review
Due ≤ 7 days6critical
Open permits12on board
CAP recurring2actions
Illustrative · demonstration fleet

Screens and figures show a demonstration fleet with fictional rigs, crew and vendors.

The problem

You find out
at the audit.

On most rigs, compliance lives in spreadsheets, binders and one person's memory. By the time it reaches the office or the operator it is weeks old and formatted differently by every contractor.

AiCE turns the working day into the record. The crew raises permits, writes cards and issues stock the way they do now. AiCE files, seals, counts and checks it as it happens.

Always audit-ready

No question about status. Ever.

Every certificate, inspection, regulatory item, training ticket, maintenance task and critical spare runs on one clock. Ninety days out is enough to mobilise a vendor; fourteen is not. AiCE warns at each step, then daily, and the Critical view puts everything due inside seven days or already overdue on one list.

90 days30 days14 daysDaily until done

When the auditor, the client rep or the office asks, the answer is already on the screen, with the document one click away.

ItemRigDue
Lifeboat davit fall wireRegulatory · annual renewal
TAD-32 days over
Pedestal crane #1 load testCertificate of conformity
TAD-2Today
Mud pump liner 6½″Critical spare · 1 on hand, minimum 4
TAD-4Below min
BOP annual inspectionThird-party inspection
TAD-15 days
H2S awareness ticket · 3 crewTraining matrix
TAD-16 days
Top drive 5-year overhaulRunning hours vs manufacturer interval
TAD-57 days

Built for your role

What changes on your shift.

Nobody buys every screen. Each person on the rig lives in four or five of them. Pick your job.

Your morning in one screen. Your month-end in one click.

  • Critical firstEverything overdue or due inside seven days, across every register, on one list before the morning meeting.
  • Permits you can see from your deskThe live board, who holds what, and the chain of signatures behind each one.
  • STAR statistics computed, not countedIncidents, cards and safety stats from the records themselves, with the month tabs already laid out.
  • The audit answer is already on the screenWhen the client rep asks, you open the register, not a binder.
Screens you will live in
DashboardCriticalPTW DashboardSTAR SafetyReportsDowntimeBudget
Where

Your office PC, through the browser. The same record the radio room and the stores are writing to.

Augmented intelligence

AI that reads every record, and shows its working.

The "Ai" in AiCE is augmented, not automatic. It reads what the crew writes and what the stores record, and puts the few things that matter in front of a person, with the reasons.

BBS-2026-TAD1-UE01TAD-1Drill floor14:20
"Tong nearly struck the floorman, missed him by inches when the joint slipped out of the elevators."
Filed asCommendation · Housekeeping
Reads asNear miss · dropped object, line of fire
Open the cardAgree, escalateClassification stands
SafetyCards that sound worse than they were filedEscalation suggestions, an exception board of four rows, and under-classification by area as a reporting-culture signal.
StoresParts running out before the shelf is emptyRising draw, runway against lead time, and minimums that keep being breached.
MaintenanceFailures that are really one failureEquipment-tagged downtime and corrective actions that keep coming back.
ProcurementSuppliers measured, not rememberedLearned lead times and single-source exposure from every receipt.
DocumentsPaperwork read for you, checked by youOffline OCR that types the document, shows where each value came from and flags what disagrees.
It suggests. People decide.No classification, stock level or record is changed without a named person agreeing.
It shows its working.Every flag quotes the words or figures that raised it.
It stays on the rig.Nothing is sent to an outside service. It works with no internet at all.

The business case

More of the business case.

Four more places the record turns into money, from vendors measured on what arrived to the fleet link.

01From day one

Vendors measured on what arrived

Every purchase request and purchase order is tracked from the moment the vendor receives it to the moment the part lands on the rig, and on-time delivery is measured per vendor with the sample size shown. Vendor records carry notes, so the next order is placed with the history in view. A score that adds certificate quality and price against quote is next on the roadmap.

02From day one

Proof in the picture

Maintenance jobs, CAP actions and STAR items close with a photograph attached as proof of completion, attributed and timestamped. It is stored with the record and findable years later, when the client or the auditor asks what was done and by whom.

03Fleet link · 2027

One fleet, one stock

Every rig's stores are weighed against the others. A surplus on one rig and a shortage on the next is a transfer on the supply boat, not an emergency order with air freight on top. Inventory is equalised across the fleet, and total spend falls from the month the link goes live.

04Then

Sees the failure before the shelf does

On the roadmap, not in today's build. Once a rig has written enough consumption history, a part drawn faster than its history says it should will be flagged as a possible maintenance escalation, and a minimum that keeps being breached, or never comes close, will come with a recommendation to raise or lower it.

Legacy reporting, retired

The month-end report is already written.

Most of a rig's reporting is retyping what already happened. AiCE captures it once, at the point of work, so the report is a button, not a week.

Task
Legacy way
With AiCE
Monthly HSE statistics
LegacyCount the cards, permits and incidents by hand, copy them into the template, email it ashore.
With AiCESTAR and the HSE report are computed from the records. Export, done.
Certificate expiries
LegacyScroll a spreadsheet of hundreds of rows and hope the date column is right.
With AiCEReminders at 90, 30 and 14 days, and the Critical list is already sorted.
Stock count and reorder
LegacyPhysical count, reconcile against the ledger, guess the reorder quantity.
With AiCEThe ledger is the count. Runway and lead time say what to order and when.
Downtime report
LegacyRebuild each event from the daily reports and work out the cost by hand.
With AiCEEach event is captured with cause, equipment and cost as it happens.
Audit or client visit
LegacyDays of pulling certificates, permits and training records into binders.
With AiCEOpen the register, filter, export. Every document is one click from its record.
Training matrix
LegacyChase tickets before crew change; find the lapsed one at the heliport.
With AiCETickets expiring inside sixty days are listed, by person, ahead of the rotation.
Vendor review
LegacyOpinions and memory of the last bad delivery.
With AiCEOn-time delivery measured from every receipt, with notes on the vendor record.
Operator reporting
LegacyA monthly pack, different for every contractor, already out of date.
With AiCEThe operator reads the live record through its own read-only window.
Your rig's numbers

How many hours is the paperwork?

The figures below are examples. Replace them with yours; the result updates as you type.

Estimated from your inputs

Supervisor and storeman hours back in the day.
The same hours as shifts, so the scale is visible.
Across the rigs you entered.
Before counting lapsed certificates, emergency freight or a stopped rig, which this calculator leaves out.

This is an estimate built from the numbers you typed, not a measurement. Once onboarded, your rig's own records replace it.

What you would otherwise buy

One system, or four.

Most rigs run some mix of these three today. None of them was built for the whole rig, so the gaps get filled with spreadsheets and the office pays for all of it.

Need
TodayPaper and spreadsheets
Point toolHSE card system
EnterpriseERP maintenance module
One systemAiCE Field Logistics
Permits with enforced signatures
Paper and spreadsheetsCarbon books. Signatures skipped, back-dated, lost.
HSE card systemTypically not included.
ERP moduleUsually a separate electronic permit product and project.
AiCEFive sealed permit types, signing order enforced, live board.
Certificates and inspections on one clock
Paper and spreadsheetsA date column someone has to read.
HSE card systemCards and incidents, not registers.
ERP moduleMaintenance plans, yes; certificates and third-party inspections need configuring.
AiCECoC, inspections, equipment and tickets with the 90 / 30 / 14 / daily ladder.
Stores with a scanner and labels
Paper and spreadsheetsPhysical counts and a ledger that drifts.
HSE card systemNot included.
ERP moduleInventory exists ashore; rig-floor scanning is usually extra hardware and licences.
AiCEPDA scanner, label printer, ledger-driven counts, hazmat placement.
Safety cards and AI review
Paper and spreadsheetsCards in a box, counted at month-end.
HSE card systemCards and statistics; that is what it is for.
ERP moduleNot what it is for.
AiCECards in Thai or English, STAR statistics, and AI that flags the ones filed too softly.
Works with no internet
Paper and spreadsheetsPaper always works.
HSE card systemUsually cloud-hosted; needs the link.
ERP moduleNeeds the link to the office server.
AiCERuns entirely on the rig host. Nothing waits on a satellite.
The operator can see it live
Paper and spreadsheetsA monthly pack, different per contractor.
HSE card systemOnly if the operator buys the same product.
ERP moduleThe contractor's ERP is not open to the operator.
AiCEA read-only window on every rig running it, included.
Installed and in use
Paper and spreadsheetsAlready there, which is the problem.
HSE card systemWeeks, plus accounts for every user.
ERP moduleMonths, consultants, and a change request for every form.
AiCEInstalled in a day, then a service technician on board until your heads of department are comfortable.
How you pay
Paper and spreadsheetsFree, until the audit or the stopped rig.
HSE card systemPer rig or per user, per year, for one function.
ERP modulePer seat and per module, plus the implementation.
AiCEOne licence per rig, per year. Every screen, every user on board.

The three comparison columns describe categories of product as they are commonly sold, not any particular vendor's offer. Check the specifics of whatever you run today; if yours does better than the column says, good.

Linked to the fleet

Surplus on one rig. Shortage on another. Not any more.

Every rig's stores, critical spares and lead times in one fleet view. Before anyone pays for an emergency air freight, AiCE checks whether a sister rig already has the part on the shelf.

Move 3 liners from TAD-1 to TAD-4 on the next supply boat.No emergency order, no idle stock, and both rigs back above minimum.
Fleet link · rolling out 2027

Fleet-wide part search

"Does anyone have this?" becomes a query instead of a chat thread at 3 a.m.

Critical spares, fleet-wide

Every part whose absence stops a rig, watched across the fleet against real lead times.

Value grows with every rig

One rig gives you a maintenance and stores system. Five rigs give you the consumption and failure history that makes planning ahead possible.

See it on a rig.

Thirty minutes on a call, then a service technician on board with your crew.